Upgrade Your Home with Simple Improvements


September 11, 2025

How Electrical Panel Upgrades Affect EV Charger Installation in Charlotte Homes

Homeowners across Charlotte are adding Level 2 EV chargers to daily life. The charger itself is simple; the electrical service that feeds it is not. The panel in a SouthPark ranch from the 1970s is a different story than a new build in Ballantyne. This article explains how electrical panel capacity and condition affect EV charger installation, why some homes need upgrades, and how Ewing Electric Co. approaches safe, code-compliant installs in Charlotte, NC.

Why panel capacity is the first question

A Level 2 EV charger draws a continuous load of 16 to 48 amps for hours. Most popular models land at 32 or 40 amps on a dedicated 240V circuit. The National Electrical Code treats EV charging as a continuous load, so the circuit and breaker must be sized at 125% of the charger’s continuous current. A 40-amp charger needs a 50-amp breaker and 6-gauge copper conductors. That load has to fit within the home’s service capacity and the panel’s remaining space and amperage.

In many Charlotte homes, the main service is 100 or 150 amps. If the house already runs electric HVAC, an electric range, a dryer, and a heat pump water heater, the panel may not have margin for a new 50-amp circuit. A load calculation tells the truth, and it is the difference between a smooth install and nuisance breaker trips.

Quick primer: service size, panels, and breakers

The service size is the total amperage the utility supplies to your home, typically 100, 150, or 200 amps in Charlotte-area residences. The main breaker sets that limit. The panel is the distribution hub with spaces for branch circuit breakers. Some older panels are “full” even when there appears to be room due to tandem limitations or bus rating constraints. Others are obsolete or recalled, such as certain Federal Pacific Electric and Zinsco models, which often warrant replacement for safety and inspection reasons.

An EV circuit calls for a dedicated two-pole breaker. If the panel has no free spaces, sometimes a subpanel solves it. If the calculated service load exceeds safe limits, an upgrade to a larger main panel or a full service change to 200 amps may be the right path.

Charlotte code, permitting, and utility realities

All EV charger installations in Mecklenburg County require a permit and inspection. Ewing Electric Co. pulls permits and schedules inspections, then coordinates any required service work with Duke Energy. Service upgrades that change the meter base or service conductors need utility coordination and sometimes brief power shutdowns. Typical inspection windows are one to two business days after rough-in or final wiring, though timing varies by season.

Many neighborhoods in Plaza Midwood, Dilworth, and Elizabeth have older 100-amp services with detached garages. Trenching for conduit, bonding at the detached structure, and GFCI-protected EV circuits can factor into scope. Newer areas like Berewick or Highland Creek more often have 200-amp services with room for a 50-amp breaker, which simplifies EV charger installation in Charlotte NC.

How a load calculation affects your options

A load calculation looks at square footage, fixed appliances, HVAC tonnage, electric water heating, ranges, laundry, and the proposed EV charger. The calculation follows NEC Article 220 demand factors. In practical terms, it answers two questions. First, can the panel handle a new 50-amp two-pole breaker without pushing past the service rating under normal diversity. Second, will the home experience frequent trips if two or three heavy loads run at once.

In a 1,900-square-foot Myers Park bungalow with gas heat and gas cooking, a 32-amp charger usually fits on a 100-amp service after calculation. In a 2,800-square-foot Steel Creek home with dual electric heat pumps and an electric range, that same charger may push a 100-amp service too hard, making a 200-amp upgrade the prudent choice. Ewing Electric Co. shares the math and explains trade-offs before any work begins.

Panel upgrade or not: the tipping points

Upgrades become likely when the panel has no free spaces, when the main breaker is 100 amps and the home runs multiple electric appliances, or when the panel brand is flagged for safety concerns. A full service upgrade to 200 amps creates headroom for present and future loads such as a second EV, a hot tub, or a heat pump water heater. That room also reduces nuisance trips and extends component life because breakers are not running at the edge.

There are middle-ground options. A load-shedding smart panel or a demand management device can allow a 40- or 48-amp charger to pause briefly when the home crosses a set threshold. This approach often avoids a service upgrade in homes that sit close to the margin. It works well in townhomes in South End where service space is tight, and it keeps the charging experience consistent for overnight schedules.

Conductor runs, placement, and charging speed

The charger location matters. A garage wall near the panel keeps conductor runs short, which saves on copper cost and voltage drop. A detached garage or a far wall in a large three-car garage may require longer runs, larger conductors, and more labor. For a 50-amp circuit, AWG 6 copper is typical up to moderate distances. Over long runs, upsizing may be required to control voltage drop, especially at 48-amp charging. Ewing Electric Co. reviews cable routing, mounting height, and cord reach with the homeowner so the final location works with daily parking habits.

Charging speed must match lifestyle and service limits. A Ewing Electric Co: EV charger installation Charlotte NC 32-amp charger adds roughly 25 miles of range per hour for many EVs. A 48-amp charger might add 35 to 40 miles per hour. For most Charlotte commutes, a 32- or 40-amp setting fills the battery overnight. Many chargers allow adjustable amperage, which lets the electrician set a lower current when panel margin is tight, then raise it later after a panel upgrade.

Safety and code details that protect the home

EV charging is a continuous load. Breakers, wire size, and terminations must be rated accordingly. GFCI protection is required for indoor and outdoor receptacle-type EV outlets and for many hardwired chargers depending on listing. Bonding and grounding must be correct at the panel and at any subpanel feeding a detached structure. Conduit support, working clearances around the panel, and proper labeling matter to pass inspection and to keep service personnel safe.

Older panels with aluminum branch circuits, double-lugged neutrals, or burned bus stabs often reveal themselves during the EV site visit. Addressing those issues during the project protects the home and prevents inconvenient trips later. Ewing Electric Co. documents findings with photos and straight talk, then recommends the least disruptive fix that meets code.

Typical costs and timelines in Charlotte

Every home is different, but ranges help planning. A straightforward Level 2 EV charger installation in Charlotte NC, with a short run to a modern 200-amp panel, often falls in the $700 to $1,400 range for labor and materials, not including the charger. Longer runs, attic or crawlspace work, or detached garages can push costs into the $1,500 to $2,500 range.

Panel replacement with a like-for-like service size commonly runs $2,000 to $3,500 depending on brand, grounding upgrades, and relocation needs. A full 200-amp service upgrade with new meter base, mast, panel, grounding, and permitting can land between $3,500 and $6,500 in the Charlotte market. Demand management devices add a few hundred to over a thousand dollars depending on model and integration.

Install timelines usually range from one day for a simple charger circuit to two to three days for a panel change, plus inspection scheduling. Service upgrades that involve Duke Energy can require a short outage window, which Ewing Electric Co. coordinates in advance.

Common scenarios seen across Charlotte neighborhoods

In NoDa, many mill houses have 100-amp services and older panels with limited spaces. A 32-amp charger on a new dedicated circuit, paired with a managed charging schedule, often fits today and leaves room for a future 200-amp upgrade.

In Ballantyne and Weddington, large homes with 200-amp services usually accept 40- or 48-amp chargers without trouble. The focus becomes clean routing, neat conduit work, and charger placement that reaches both parking bays.

In SouthPark, many homes renovated in the 1990s have subpanels feeding garages. Verifying feeder size and neutral-ground isolation in the subpanel matters before landing an EV circuit there. Sometimes moving a few garage loads to the subpanel frees space in the main for the EV breaker.

In Uptown condos and townhomes, the panel load and HOA rules guide the solution. A lower-amperage charger with load management is common, and conduit paint to match garage walls keeps the install discreet.

How Ewing Electric Co. plans a smooth install

Homeowners call with two goals: charge fast and keep the home safe. The team starts with a site visit and a code-compliant load calculation. They inspect the panel, check grounding and bonding, and look for space and bus ratings. They review charger location and cable path, then provide clear options. If a panel upgrade is wise, they explain why, show photos, and outline cost and schedule. If a demand management device solves the problem neatly, they show how it works and what it saves.

The company handles permits, inspection, and if needed, Duke Energy coordination. On install day, the crew protects floors, makes clean penetrations, and labels the new circuit. Before leaving, they test GFCI functions, confirm charging current, and walk the homeowner through charger settings, load limits, and best practices.

Simple ways to get ready for an estimate

  • Share the EV make and model and the preferred charger brand or amperage.
  • Send photos of the main panel with the door open and the main breaker visible.
  • Note where you park and measure distance from panel to the preferred charger location.
  • Mention any large electric appliances added in the past year, such as a heat pump water heater.
  • Tell the team if you plan to add a second EV within the next 12 to 18 months.

Ready to install an EV charger in Charlotte?

Whether the home needs a new 50-amp circuit or a full 200-amp service upgrade, the first step is an honest load calculation and a clean plan. Ewing Electric Co. specializes in EV charger installation Charlotte NC homeowners can count on. For a fast, code-compliant install with clear pricing, request a site visit. The team serves Charlotte, Matthews, Mint Hill, Huntersville, and nearby areas, and schedules estimates quickly. Booking is simple — call or request a consultation online, and get charging the right way.

Ewing Electric Co provides electrical services in Charlotte, NC, and nearby communities. As a family-owned company with more than 35 years of experience, we are trusted for dependable residential and commercial work. Our team handles electrical panel upgrades, EV charger installation, generator setup, whole-home rewiring, and emergency electrical service available 24/7. Licensed electricians complete every project with code compliance, safe practices, and clear pricing. Whether you need a small repair at home or a full installation for a business, we deliver reliable results on time. Serving Charlotte, Matthews, Mint Hill, and surrounding areas, Ewing Electric Co is the local choice for professional electrical service.

Ewing Electric Co

7316 Wallace Rd STE D
Charlotte, NC 28212, USA

Phone: (704) 804-3320

Website: ewingelectricco.com | Electrical Contractor NC

Social Media: Facebook | Instagram | Twitter

Map: Google Maps